




DREAMS PROJECT
The Dreams Project, is a book where I have documented my dreams between November - January. By painting the dreams and then explaining them and analysing them. The artwork used in the book was inspired by the surrealist movement from the 1950s and the graphic design was inspired by the Deligt movement in the 1920s.